April 26, 2017

We all know that most new buildings will require mechanical heat recovery and ventilation and the regulations will at some point make this a requirement in all new buildings due to the airtightness of the build. Ecoenvelope are very pleased to be able to supply the Ger...

April 24, 2017

Well almost, waste adds cost to our products and as part of the new circular economy we are committed to a zero waste policy. A good example of this is our off-cuts. All of our projects will require cutting and shaping elements that make up the complete thermal envelop...

April 20, 2017

When we supply a kit for a house, an office or a school, all of the components required to assemble the shell to wind and watertight can be supplied. Standard shell kits will include walls, roof, internal wall framing, intermediate floor joists, membranes and fixings a...

April 7, 2017

I think we're past the stage of thinking that building with blocks of materials, placing one on top of the other with a wet mortar to hold it in place is a good idea. Construction time, weather, on-site wastage, thermal performance, larger internal volumes, energy savi...

Please reload

Featured Posts

introducing a new generation of ultra low energy 24 volt space heating systems using graphene super composites

February 20, 2019

1/10
Please reload

Recent Posts
Please reload

Archive